News
Monday, January 22, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of a release occurring Saturday, January 20 at the Soto 5097 12-3 2B well location, NW of McKenzie County, North Dakota. Chord Energy reported Saturday, that 500 barrels of oil were released due to an equipment failure/malfunction. Product was contained on-site and cleanup is underway. At the time of reporting 500 barrels of oil had been recovered.
Friday, January 19, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of equipment failure occurring, Wednesday, January 17 at McKenzie County, North Dakota.
Thursday, January 18, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of a spill occurring Sunday, January 14 at Mountrail County, North Dakota.
Thursday, January 18, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of an oil spill occurring Tuesday, January 16 at Dunn County, North Dakota. The fluid stayed on location.
Thursday, January 18, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of an equipment failure occurring, Tuesday, January 16 at McKenzie County, North Dakota.
Tuesday, January 16, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of an oil spill occurring Saturday, January 13 at the JORE (FEDERAL) 1-12H well, McKenzie County, North Dakota. The spill remained within the tank battery containment berm.
Tuesday, January 16, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of a water injection line leak occurring Thursday, January 11 at the RS-ROSS 65-85 SWD1. All produced water has stayed on pad and within the berm. There is no offsite impact.
Tuesday, January 16, 2024
Categories: Department of Mineral Resources, Oil and Gas Division, State of North DakotaBISMARCK, N.D. – The North Dakota Oil and Gas Division was notified of an oil spill occurring Saturday, January 13 at Watford City, McKenzie County, North Dakota. The Brine spill within containment, froze pipe.
Monday, December 18, 2023 at 03:00 pm
Categories: Geological Survey, Paleo/Fossil, State of North DakotaPartial mammoth skeleton with complete tusk will be the focus of scientific research and educational outreach
Tuesday, October 24, 2023
Categories: Department of Mineral Resources, Oil and Gas Division